Hervey Bay Airport – Upgrade Works – Urangan Hervey Bay
- Existing regional airport upgrading facilities due to regional growth
- Staged packages of works delivered to approved annual budgets and whilst airport remains operational
- Read More
Scope:
- Appointed by Fraser Coast Regional Council as nominated superintendent for AS4902 / AS4905 contracts (Project Management)
- Chair projects kick-off, co-ordination, defects and close out meetings
- Independent advice to council on construction and contractual matters
- Independent assessment of builders claims
- Independent assessment of change management events (time & cost)
- Projects close out and quality checks – defects management
Achievements:
- Successfully delivered work package contracts on time and under budget
- Positive stakeholder engagement and outcomes
- Awarded further work packages following procurement including HVAC upgrade

Ramada by Wyndham – Urangan Hervey Bay
- 2 x two storey buildings and three storeys building with basement parking
- Ongoing building issues with original site and building stormwater design
- Read More
Scope:
- Project Manager appointed on behalf of the Body Corporate
- Preliminary investigations into latent building defects from original design
- Site stormwater and roof drainage / Roofing materials
- Identify and develop cost effective options and solutions
- Identify suitable consultants to complete optimal design solutions
- Extensive reporting and estimating to inform multiple stakeholders
- Identify trades, obtain trade pricing, supervision and inspection of works
Achievements:
- Code compliant solution achieved that could be completed as operational maintenance saving significant cost if avoiding full roof replacement
- Body corporate stakeholders fully informed and successful ongoing stages
- Engaged for further ongoing stages to improve holistic site drainage and preserve the building asset

Gataker’s Bay Restaurant Redevelopment Project – Point Vernon Hervey Bay
- Proposed redevelopment of existing buildings and gardens mixed use development to accommodate multiple future tenancies including restaurant, bottle shop, deli, owners’ accommodation
- Read More
Scope:
- Appointed by owner as their representative as Project Manager for the scope, design, procurement of builder and construction delivery acting as superintendent
- Develop new scope and document in detail
- Engage with builders and draftsmen to create new design drawings to suit scope
- Provide budget updates
- Prepare tender documents for suitably qualified builders to price
Achievements:
- Completed the scope and tender documentation
- Continuing to support the tender process to appoint builder and future construction delivery

Riverside Christian College – Maryborough West
- Existing college campus investigating redevelopment of Junior College buildings
- Proposed demolition and new redevelopment of new two storey classrooms for Junior College
- Read More
Scope:
- Appointed by the architect/college to perform staged Quantity Surveyor cost planning and procurement services
- Cost Plan – Concept design complete
- Funding applications based on concept design and cost
- Cost Plan – Detailed design complete
- Procurement of suitable builder
Achievements:
- Completed the preliminary cost plan to secure future funding
- Completed the detailed cost plan and with refined design managed to remain within overall budget
- Benchmarked cost plan with local builders and contemporary construction data to validate cost plan updates accurately
- Continuing to support the tender process to appoint a suitable builder upon completion of 100% For Construction design
- Awarded further packages as part of ongoing re-development of college campus

ISIS State High School – Childers Fraser Coast
- Existing state high school upgrades to facilities
- Modernisation of school metalwork and woodwork shops
- Read More
Scope:
- Appointed by architect/Q-Build to provide Quantity Surveyor cost planning services
- Cost Plan – Preliminary design complete
- Cost Plan – For Construction to complete
- Provide detailed estimate and schedule report to help inform future budget and planning decisions by local council
Achievements:
- Completed the preliminary design on time and to budget
- Benchmarked the preliminary cost plan with contractor indicative pricing and contemporary pricing to validate the cost plan accurately
- Ongoing engagement to complete next stages of design development pre-contract

Brolga Theatre – Maryborough
- Existing regional entertainment centre requiring major HVAC overhaul
- Complete major HVAC upgrade in stages whilst remaining operational
- Read More
Scope:
- Appointed by Fraser Coast Regional Council to complete a Quantity Surveyor detailed estimate of the proposed HVAC upgrade design
- Provide a proposed construction schedule to deliver the works in progressive stages
- Provide detailed estimate and schedule report to help inform future budget and planning decisions by local council
Achievements:
- Completed the detailed estimate on time and to budget
- Benchmarked the detailed estimate with consultant and contractor indicative pricing to validate the estimate accurately
- Project budget adopted for delivery of upgrades in future financial years

Maryborough Amateur Athletics Club (MAAC) – Tinana Maryborough
- Amateur sport club was flooded in major flood events 2012/2022
- Extensive damage from flooding to be repaired under grant funding from the Department of Tourism, Innovation & Sport (CRARR Program)
- Read More
Scope:
- Project Manager appointed to represent the MAA Club
- Assist the Club to scope out the extent of repairs and prepare budgets for initial funds submission and acquittal
- Prepare and submit all documentation on behalf of the Club
- Assist treasurer to review and submit all financial requirements
- Monthly reporting and liaison with the Club and Department representatives
- Regular inspections and assistance to the Club
- Program close out
Achievements:
- All repairs completed within grant funding timeframes whilst successfully obtaining an approved Extension of Time due to ongoing bad weather throughout
- Additional repairs identified and completed within approved funding budget
- Successful completion and acquittal of the project

Maryborough Service Delivery Centre Rail Facility – Maryborough
- Existing regional rail maintenance and overhaul facility
- Multiple contracts with rail fleet providers
- Read More
Scope:
- Appointed by Downer EDI Rail to support commercial management of projects
- Assist with preparing and co-ordinating complex contractual claims
- Assist with defending major subcontractor claims for prolongation and delay
- Prepare formal briefing papers and presentations to senior management
- Manage team of external claims consultants including claims specialists, forensic planners and legal representatives
- Review formal claim / dispute documents, prolongation, delay and disruption
Achievements:
- Completed significant undisclosed formal claims / disputes to clients
- Achieved significant settlement on undisclosed terminated and completed contracts
- Awarded ongoing works including setting up project with nominated builder for Torbanlea Manufacturing Facility as part of Queensland Train Manufacturing Program

Fisherman’s Beach – Woppa (Great Keppel Island) Capricorn Coast
- Great Keppel Island development of architectural master plan for the Arrivals Precinct proposed to be located at Fisherman’s Beach
- Read More
Scope:
- Appointed to complete high level feasibility Quantity Surveyor cost plan estimate
- Cost Planning – Feasibility for built form
- Purpose to secure state government funding to develop island infrastructure
Achievements:
- Completed the cost plan to budget and on time
- Supported further submissions to state to promote the project recently tendered for detailed design phase

Sunlife Australia – Urangan Hervey Bay
- Concept plans developed for proposed over 50s resort
- Feasibility stage of proposed over 50s lifestyle resort in Warwick Queensland
- Read More
Scope:
- Appointed to assist owners/developers from Sunlife Australia with development project management
- Create 1–3-bedroom standard dwelling layouts and assist with marketing
- Review optimisation of dwellings to suit sub-division plot layout
- Cost Planning – Feasibility & cost options
- Development risk analysis and risk contingency estimating
- Liaise with and co-ordinate design consultants for architectural, geotec, civils and utilities concept design
- Identify local builders through Expression of Interest
Achievements:
- Helped to complete development concept master plan
- Provided accurate cost planning services with market benchmarking
- Identified suitable consultants and builders to support the development
- Provided cost planning to developer to assist with on-selling of the land

Sunlife Australia – Warwick Queensland
- Concept plans developed for proposed over 50s resort
- Feasibility stage of proposed over 50s lifestyle resort in Warwick Queensland
- Read More
Scope:
- Appointed to assist owners/developers from Sunlife Australia with development project management
- Create 1–3-bedroom standard dwelling layouts and assist with marketing
- Review optimisation of dwellings to suit sub-division plot layout
- Cost Planning – Feasibility & cost options
- Development risk analysis and risk contingency estimating
- Liaise with and co-ordinate design consultants for architectural, geotec, civils and utilities concept design
- Identify local builders through Expression of Interest
Achievements:
- Helped to complete development concept master plan
- Provided accurate cost planning services with market benchmarking
- Identified suitable consultants and builders to support the development

Ramada Sky Hotel – Urangan Hervey Bay
- 8 storey proposed hotel development adjacent to existing hotel
- Roof top restaurant and bar
- Read More
Scope:
- Support owner/developer with development project management
- Produce the project brief
- Cost planning – Preliminary design with trade pricing coverage
- Value engineering and cost optioneering for major building elements
- Trade packaging and market approach for trade pricing
- Investigate options with developer to source companies to provide materials and skilled labour overseas due to contemporary market constraints
Achievements:
- Full cost plan update delivered for client on time and to budget
- Trade pricing to validate cost plan update accuracy
- Helped identify opportunities to overcome market constraints
- Identified savings in the structure and super-structure by optimising design with consultants